What was the purpose of the Jpdo?

The JPDO now serves as a focal point for coordinating the research related to air transportation for agencies across the Federal government, including the Departments of Transportation, Commerce, Defense and Homeland Security, as well as NASA and the Office of Science and Technology Policy.

How do I make an integrated master plan?

The 5 Steps in Developing the Integrated Master Plan (IMP) [1]

  1. Step 1: Determine the IMP structure and organization.
  2. Step 2: Identify events, accomplishment and criteria.
  3. Step 3: Prepare the introduction and narrative section.
  4. Step 4: Complete the numbering system.

What is integrated program planning?

Integrated program planning and execution (IPP&E) provides the ability to generate a complete program-specific plan (technical requirements, work breakdown structure, risk/ opportunity, cost estimate, integrated master plan and policy/ procedures defining standard work, planning eBOM, logical structure, etc.)

What is IMS in project management?

The primary purpose of an Integrated Master Schedule (IMS) is to provide all project participants with a consistent tool for planning, executing and tracking technical, schedule, cost and risk activity. …

Who is responsible for Statusing the integrated master schedule?

In an Integrated Program Management (IPM) environment, the Master Scheduler (sometimes called a Program Master Scheduler or Integrated Master Scheduler) is an experienced scheduler who is responsible for maintaining the Integrated Master Schedule (IMS) for one or more programs.

What is the difference between IMS and IMP?

An IMP is an event-driven plan that documents the significant accomplishments necessary to complete the work and ties each accomplishment to a key program event. An IMS is an integrated and networked multilayered schedule of program tasks required to complete the work effort captured in a related IMP.

What is IMP process?

The IMP provides a better structure than either the Work Breakdown Structure (WBS) or Organizational Breakdown Structure (OBS) for measuring actual integrated master schedule (IMS) progress. The primary objective of the IMP is a single plan that establishes the program or project fundamentals.

What is a master operations schedule?

A master production schedule (MPS) is a plan for individual commodities to be produced in each time period such as production, staffing, inventory, etc. It is usually linked to manufacturing where the plan indicates when and how much of each product will be demanded.

What is an integrated project schedule?

The Integrated Project Schedule describes the entire project scope, and activities from all required trades are included. Further, activities should be fully linked. The IPS also shows a balance and the links between major project functions: engineering, procurement, construction, and commissioning.

Did integrated master schedule?

The legacy Integrated Master Schedule (IMS) Data Item Description (DID) defines the requirements for the content and submittal of the contractor Master, Intermediate and Detailed schedules. The IMS must be submitted at least monthly either before or with the legacy Contract Performance Report (CPR).

What is the correct schedule of master production?

Due to software limitations, but especially the intense work required by the “master production schedulers”, schedules do not include every aspect of production, but only key elements that have proven their control effectivity, such as forecast demand, production costs, inventory costs, lead time, working hours.

What is strategic capacity planning?

Capacity planning strategy involves the process used to determine the resources manufacturers need to meet the demand for their products or services. The level of capacity directly relates to the amount of output in the form of goods and services manufacturers can produce to satisfy customer demand.